TM44 inspections for commercial buildings020 3811 8331

Property and facilities guidance / Practical decisions

TM44 for Industrial Estates and Multi-Unit Business Parks

A business park may have one managing agent but many buildings, tenants and independent cooling systems. Plan the inspection programme around those physical and operational boundaries rather than a single estate name.

Begin with an address-and-plant schedule that distinguishes office comfort cooling, shared services and process equipment. This helps the provider scope each building and coordinate access without making unsupported estate-wide coverage claims.

The essentials

What you need to know

  • List each building, occupier and equipment contact.
  • Separate comfort cooling and process-system questions.
  • Check capacity and control per relevant building.
  • Agree site-specific access and assessment deliverables.
01 / 06

Separate business units, occupiers and building addresses

Use full postal addresses and unit identifiers to distinguish buildings in the park. Record whether an occupier spans several units or a building contains more than one tenancy.

Keep the estate’s procurement contact separate from the local access and technical contacts. One central spreadsheet entry should not obscure independently operated installations.

Understand TM44 inspection requirements
02 / 06

Identify office comfort cooling versus process applications

Identify cooling for offices, welfare and other occupied spaces alongside production or storage refrigeration. Record the intended use and any shared plant.

The government practical inspection guide is not intended for dedicated process cooling and does not establish a blanket comfort-only statutory exemption. Refer mixed or unusual plant for professional scoping.

03 / 06

Review effective rated output and grouping rules

Collect rated cooling output and the relationship between relevant units. For England and Wales, consider the more-than-12 kW threshold and control-based grouping within a building.

Do not total the whole estate as though separate buildings were one system. Equally, several room units in the same building should not automatically be treated as unrelated.

04 / 06

Establish plant operation and report ownership

Identify the party authorising technical work for each installation. Compare landlord services with independent occupier equipment and record who holds the previous report.

Where management or lease documents leave a gap, ask the parties to clarify it. An estate service charge does not by itself prove every tenant’s cooling has been assessed.

05 / 06

Plan safe access around logistics and production

Provide induction, vehicle-route, loading and permit requirements for each site. Arrange escorts and safe access to roofs or elevated plant through authorised staff.

Plan around production and deliveries without assuming an inspection permits an unplanned shutdown. Disclose restrictions when scope and attendance are agreed.

06 / 06

Quote site-specific inspections without blanket coverage promises

Request a quotation listing the buildings and systems included, information dependencies and access assumptions. Confirm assessor suitability and availability for the actual programme.

Track each issued report against its site and inspection date. A coordinated estate order should not be presented as one certificate automatically covering all present or future tenants.

Request a TM44 inspection quotation
Verification / Official sources

Check the governing guidance

This article does not authenticate a government register entry or establish the status of an individual building. Confirm the applicable national framework and the actual installed equipment before relying on a compliance conclusion.

England and Wales legal points are anchored in current government publications and the regulations. Technical applicability for a specific building still requires its actual system information.