THE SHORT ANSWER
Price the inspection.
Not an imaginary certificate.
GOV.UK confirms that air-conditioning inspection fees vary by assessor. We do not publish an unverified lowest-price claim or promise a certificate before a suitably accredited person has assessed the system. Read official fee guidance.
01 · THE QUOTATION VARIABLESFour questions that change the fee.
A fee should reflect the assessment you actually need, not the number on an advert. These are the details that allow an accurate commercial scope.
01What is actually installed?
The number and type of cooling systems, manufacturer-rated capacity, equipment locations and controls determine the technical scope. A single rooftop chiller and a building full of separately controlled splits are not identical assignments.
02How complex is the assessment?
Plant arrangements and assessor competence matter. Larger or more complicated systems may require a different level of accredited assessor and more time on site, even if the buildings have the same postcode.
03How accessible is the equipment?
Roof access, plant-room keys, permits, escorts, occupied premises and restricted operating windows can change the visit programme. Tell us about them before a fee is agreed.
04One building or a portfolio?
Multiple properties may benefit from coordinated scheduling, but a portfolio quote still needs a defensible scope for each building, the responsible controller and the separate inspection evidence.
What should be explicit in a written quotation?
The quoted price and the inspection's deliverables should describe the same job. Before booking, check each line below against your actual site or estate; anything uncertain should be labelled for confirmation, not quietly assumed to be included.
Inspection scopeBuildings, relevant cooling plant, assessor competence and agreed areas of access.
Site attendanceWhat the accredited assessor is scheduled to inspect, and any access assumptions.
Report and recordThe statutory report and applicable lodgement or register arrangements, explicitly described.
Commercial termsPrice basis, VAT treatment, travel or parking, exceptional access and any excluded work.
A TM44 energy inspection does not automatically include refrigerant leak repair, routine mechanical servicing, control-system upgrades or a new EPC. If additional work is needed, it requires a separately defined scope.
02 · REAL BUYING SITUATIONS
The same question. Three different buildings.
01 / A managed officeOne site, incomplete plant information
Start with the full address, type of cooling system, any previous report and a site contact. Unknown capacity or unit count can be resolved in the scope review; do not guess a figure simply to receive a headline price.
Ask about a single building02 / A multi-let propertyLandlord plant plus tenant systems
We need to establish which cooling systems are controlled by the landlord and which by occupiers. Building title alone cannot determine the legal responsible person or the assessment boundary.
Read the responsibility guide03 / A property estateSeveral sites and different renewal dates
Share a site list and any current report references. A phased plan can identify unknowns, help prioritise deadlines and produce individually scoped quotations before attendance is confirmed.
Plan a portfolio review Is it cheaper to pay the penalty instead?
No penalty replaces the statutory duty. Current GOV.UK guidance for England and Wales states a £300 charge for failing to have the required air-conditioning inspection report, with a separate £200 charge potentially applying when a valid report is not produced within seven days of an appropriate enforcement request. These are enforcement provisions, not alternative prices for compliance.
The exact duty depends on the relevant system, control arrangements and national jurisdiction. A qualifying inspection may be required when the effective rated output is more than 12 kW, and repeat inspections must be spaced no more than five years apart in England and Wales.
COMPARE QUOTES LIKE FOR LIKECheck that two TM44 quotations cover the same work
Compare scope, not just price. Ask both providers to confirm the same equipment, accredited assessor, inspection deliverables and access conditions in writing.
Plant and boundariesWhich addresses, cooling systems and relevant units are included? Would further units or a second visit change the fee?
Assessor competenceWho will attend, and does their accreditation match the required system complexity?
Report and registerDoes the scope include the statutory report, scheme administration and applicable government lodgement? Confirm attendance and report timing separately.
VAT and exclusionsAre VAT, travel, parking, congestion charges, escorts, restricted hours and specialist roof access included or charged separately?
A price range from older marketing material is not a current system-specific quote. Do not assume an advertised rapid certificate is a confirmed delivery commitment.
PREPARE YOUR ENQUIRYFive details that help us quote accurately
Share what you have. Missing system information can be clarified during technical scope review.
- Site identityFull address, postcode, building use and number of properties.
- Plant informationManufacturer labels, equipment list, photos or estimated number of systems, including any shared VRF plant.
- Existing reportPrevious report reference, inspection date and recent installation changes, if known.
- Access and deadlinePlant-room and roof access, escort, parking, restricted hours and the date inspection is needed.
- Responsible contactWho controls the plant operation where known, who can arrange access and who should receive the quotation.
Do not guess system capacity or legal responsibility. Preparing this enquiry does not confirm statutory eligibility or an appointment.
03 · READY TO ESTABLISH SCOPE?Send the building. We’ll work out what needs checking.
Address, number of sites and any equipment information you already hold are enough to begin. We will review the requirement before confirming an assessor, price or attendance. The quotation form indicates when secure online submission is available and provides direct office contact when it is not. Preparing an enquiry does not reserve an inspector.
Prepare a TM44 inspection enquiryPricing for individual buildings and property portfolios
For one site, the assessment fee depends on the systems to inspect, the quality of existing records and practical access. For several premises, consistent plant schedules and a coordinated programme can reduce avoidable administration without assuming that every building has the same inspection scope.
Written scope / transparent quotationQuestions about TM44 inspection costs
What does a TM44 inspection assess?
The accredited assessment reviews the air-conditioning system's energy efficiency and relevant sizing, controls and improvement opportunities. It produces a building-specific report rather than selling an inspection-free certificate. Routine servicing and refrigerant work have separate scopes and are not automatically included in this fee.
Understand the report and its scopeWhat is the average TM44 inspection cost?
There is no verified universal average or current from-price on this page. GOV.UK says fees vary by assessor. Ask for a written quotation based on the equipment, accredited scope, site access, reporting, lodgement responsibilities and VAT; an old price range is not a current offer.
Prepare a scope-based quotation requestHow often should I budget for an inspection?
For qualifying systems in England and Wales, plan accredited inspections no more than five years apart, using the actual inspection date. Check first-inspection, handover and equipment-change circumstances separately. Scotland and Northern Ireland need their own rules checked. A five-year planning milestone is not a prepaid renewal or a confirmed future price.
Review the renewal planning dateDoes every landlord need to pay for a TM44 inspection?
No blanket rule makes every landlord liable for every cooling system. Establish whether the equipment qualifies and who controls its technical operation. A lease, shared plant and tenant-installed systems need a factual review before deciding the responsible person or agreeing who commissions and pays for the work.
Check the responsibility arrangementsWho should carry out the inspection being quoted?
Confirm an appropriately accredited air-conditioning energy assessor whose authorised scope matches the actual plant. General HVAC experience or a website badge does not establish that coverage. Ask how assessor suitability, report production and any applicable lodgement will be handled before accepting the quotation.
Check assessor accreditation and suitabilityCan I combine TM44 with other building services?
You can ask about coordinating separate inspections or maintenance, but a combined visit and lower total cost need confirmation. Each service retains its own competence, scope and deliverables. A TM44 energy report does not replace an EPC, refrigerant checks or other building-safety duties.
Review the separate service optionsWhat if I do not have the required inspection report?
Investigate whether a relevant report already exists and arrange the necessary assessment if evidence remains missing. England and Wales enforcement provisions are explained separately on this site. Paying a penalty does not satisfy the duty, and an empty online search does not establish non-compliance on its own.
Review missing evidence and enforcementHow long will the inspection visit take?
Agree the expected attendance after the equipment and access conditions have been scoped. Several plant areas, roof permits, escorts or restricted operating hours can affect the programme. Site attendance, completing the report and lodgement are separate milestones; a short visit estimate does not guarantee delivery that day.
Plan visit time and site accessWhich documents should I prepare before the visit?
Collect available plant schedules, previous reports, model details, operating information and maintenance records. Explain missing information rather than guessing it. Confirm the site contact and access arrangements with the office; the assessor decides what can be reviewed and which limitations must be recorded.
See the optional technical preparation questionsAre the recommendations expensive to implement?
Recommendations can range from operational adjustments to work requiring a separate investment appraisal. There is no guaranteed saving, payback or upgrade price established by the inspection fee. Prioritise the actual report findings and obtain suitable advice and quotations before budgeting for changes.
Understand findings and recommendationsDoes a TM44 report improve the EPC rating or establish MEES compliance?
A TM44 report is not an EPC and does not itself change an EPC rating or determine MEES compliance. Its findings may help inform a separate energy-improvement review. Any rating or regulatory conclusion needs the appropriate assessment and evidence; no EPC uplift is guaranteed by booking TM44.
Understand separate MEES supportCan I obtain a same-day or next-day report?
Tell the office the real deadline, building and available equipment information. An appropriate assessor, access, report production and lodgement timing must all be confirmed. An urgent enquiry does not guarantee a same-day or next-day report, a reserved appointment or a statutory compliance result.
Discuss deadline feasibilityAre travel, parking and congestion charges included?
Check the written quotation for travel, parking, congestion charges, permits and repeat-visit assumptions. This page does not establish that those costs are included in every job. Resolve exclusions and any proposed additional work before booking; do not rely on an inherited blanket fixed-fee promise.
Confirm the fee and its assumptionsWhat is lodged on the official register?
For relevant England and Wales reports, lodgement creates the valid official reference associated with the inspection report. Confirm who handles that step and how the complete report and reference reach you. A private quotation or internal job number is not an official lodged-report reference.
Understand reporting and lodgementAre discounts available for multiple sites?
Request site-by-site pricing and explain any opportunity to coordinate attendance. A portfolio may reduce duplicated administration, but a discount is not automatic. Inspect each site's scope, access and jurisdiction, and retain its actual inspection date rather than changing renewal dates simply to align a commercial schedule.
Plan a multi-site scope and quotation