Establish whether the system is in scope
Confirm building, jurisdiction, relevant person and effective rated cooling output. In England and Wales, more than 12 kW is the threshold; units under the same relevant controller may need to be grouped.
Accredited TM44 air-conditioning inspections
From a single commercial premises to a complex managed estate, the first task is to confirm which air-conditioning systems require statutory assessment. We coordinate a properly scoped accredited inspection, with clear reporting and no invented compliance status.

A qualifying assessment must be performed by an appropriately accredited energy assessor. In England and Wales, the statutory framework covers systems with an effective rated output more than 12 kW and requires an inspection at intervals not exceeding five years. Read the legal inspection duties.
Each stage answers a specific question. The order matters: the correct scope comes before a price or a claimed certificate.
Confirm building, jurisdiction, relevant person and effective rated cooling output. In England and Wales, more than 12 kW is the threshold; units under the same relevant controller may need to be grouped.
Understand the equipment types, controls, site constraints, existing inspection documents, plant-room access and any suitable accredited assessor category.
Confirm the written scope, assessor, fee, reporting arrangements, visit window and access contacts. A booking is only confirmed once availability and commercial terms have been agreed.
The appropriately accredited energy assessor examines accessible parts of the system, its controls, capacity relative to building cooling needs and potential efficiency improvements.
The statutory report should identify the assessed building, assessor, inspection date, findings and relevant register reference. Record the next review and investigate unclear coverage or plant changes.
The inspection considers accessible air-conditioning plant and controls, how its capacity relates to the building's cooling requirements, operational efficiency and relevant improvement opportunities. The final written report has a defined statutory purpose: it is not a general mechanical maintenance certificate.
The official report advises on potential improvements; it does not guarantee a specific reduction in bills or an improvement to a separate EPC rating.
Understand the TM44 reportSeveral legitimate building records may exist for the same installation. None should be presented as interchangeable without actually completing the separate requirement.
Where the legal threshold applies, an accredited assessment and written report of the relevant cooling systems and controls.
Inspect the statutory requirementsEquipment-level leak checking, refrigerant records and certified technical work governed by separate refrigerant rules.
Compare the two regimesServicing, fault repairs and engineering work to maintain operation. Useful plant records, but not proof of the statutory energy inspection.
Why a PPM contract is not enoughNo. Routine service or a refrigerant leak check may be important for safe, effective operation, but neither automatically constitutes the required accredited energy assessment or report.
The report includes observations and energy-efficiency recommendations. GOV.UK states that there is no general legal obligation to implement every recommendation under the TM44 regime. Separate safety and environmental requirements must still be assessed on their own merits.
No. Attendance and reporting depend on the accredited assessor, the installation and access. We confirm the scope and realistic delivery arrangements before an assignment is accepted.
Start with the property address, the person who controls the systems and any equipment details you have. We can discuss what further information is needed; unknown cooling output should not be guessed.
Share the address, known cooling equipment, last report date and access constraints. An accredited assessor, the fee and report timing are confirmed for the individual assignment.