TM44 inspections for commercial buildings020 3811 8331

Accredited TM44 air-conditioning inspections

The right assessor. A defined inspection. A report you can account for.

From a single commercial premises to a complex managed estate, the first task is to confirm which air-conditioning systems require statutory assessment. We coordinate a properly scoped accredited inspection, with clear reporting and no invented compliance status.

  • Quotation agreed before any visit
  • Accredited energy assessors
  • Report lodged where a register applies
Energy assessor in TM44 workwear reviewing plant-room controls with a building manager
Plant room inspection
WHAT YOU ACTUALLY NEED

Not just a visit.
The correct inspection evidence.

A qualifying assessment must be performed by an appropriately accredited energy assessor. In England and Wales, the statutory framework covers systems with an effective rated output more than 12 kW and requires an inspection at intervals not exceeding five years. Read the legal inspection duties.

01 · THE ASSESSMENT JOURNEY

From first enquiry to a retained report.

Each stage answers a specific question. The order matters: the correct scope comes before a price or a claimed certificate.

01

Establish whether the system is in scope

Confirm building, jurisdiction, relevant person and effective rated cooling output. In England and Wales, more than 12 kW is the threshold; units under the same relevant controller may need to be grouped.

02

Define the systems and access

Understand the equipment types, controls, site constraints, existing inspection documents, plant-room access and any suitable accredited assessor category.

03

Agree the visit and deliverables

Confirm the written scope, assessor, fee, reporting arrangements, visit window and access contacts. A booking is only confirmed once availability and commercial terms have been agreed.

04

Complete the accredited assessment

The appropriately accredited energy assessor examines accessible parts of the system, its controls, capacity relative to building cooling needs and potential efficiency improvements.

05

Receive and retain the report

The statutory report should identify the assessed building, assessor, inspection date, findings and relevant register reference. Record the next review and investigate unclear coverage or plant changes.

What does the accredited assessor examine?

The inspection considers accessible air-conditioning plant and controls, how its capacity relates to the building's cooling requirements, operational efficiency and relevant improvement opportunities. The final written report has a defined statutory purpose: it is not a general mechanical maintenance certificate.

System and buildingLocation, relevant equipment and system coverage, including any constraints on the areas inspected.
Plant and controlsAccessible cooling equipment and control arrangements, with regard to typical operation.
Efficiency observationsAssessment of efficiency and sizing compared with building demand, with appropriate energy advice.
Traceable reportThe inspection date, accredited assessor and applicable registered report information.

The official report advises on potential improvements; it does not guarantee a specific reduction in bills or an improvement to a separate EPC rating.

Understand the TM44 report
02 · KNOW THE BOUNDARIES

Do not mistake other paperwork for a TM44 report.

Several legitimate building records may exist for the same installation. None should be presented as interchangeable without actually completing the separate requirement.

TM44

Statutory energy inspection

Where the legal threshold applies, an accredited assessment and written report of the relevant cooling systems and controls.

Inspect the statutory requirements
F-GAS

Refrigerant duties

Equipment-level leak checking, refrigerant records and certified technical work governed by separate refrigerant rules.

Compare the two regimes
PPM

Routine AC maintenance

Servicing, fault repairs and engineering work to maintain operation. Useful plant records, but not proof of the statutory energy inspection.

Why a PPM contract is not enough

Inspection questions, answered before you book.

Is the inspection the same as AC servicing?

No. Routine service or a refrigerant leak check may be important for safe, effective operation, but neither automatically constitutes the required accredited energy assessment or report.

Will the report tell us what must be repaired?

The report includes observations and energy-efficiency recommendations. GOV.UK states that there is no general legal obligation to implement every recommendation under the TM44 regime. Separate safety and environmental requirements must still be assessed on their own merits.

Do you guarantee a report within 24 hours?

No. Attendance and reporting depend on the accredited assessor, the installation and access. We confirm the scope and realistic delivery arrangements before an assignment is accepted.

What if we have no existing asset list?

Start with the property address, the person who controls the systems and any equipment details you have. We can discuss what further information is needed; unknown cooling output should not be guessed.

03 · YOUR BUILDING IS THE STARTING POINT

Tell us what you manage. We’ll establish the next step.

Share the address, known cooling equipment, last report date and access constraints. An accredited assessor, the fee and report timing are confirmed for the individual assignment.

Prepare a TM44 inspection enquiry