Use the actual accredited inspection date
A maintenance visit, plant commissioning invoice or an EPC survey is not automatically a statutory air-conditioning inspection. Find the date printed on the complete TM44 report.
TM44 renewal / Inspection evidence
Use the inspection date on your accredited report to estimate the five-year milestone in England, Wales, Scotland or Northern Ireland. This is a planning aid, not a live government register lookup, a certificate validity test or a legal determination for your building.
Across the UK, accredited inspection intervals for qualifying systems must not exceed five years. A planner is useful only when the previous report really describes the installed cooling plant and correct responsible operator.
Choose the building jurisdiction and enter the date of the last accredited air-conditioning inspection. Calculations happen in your browser; nothing is sent to TM44.uk or stored in a customer record.
Enter the inspection date printed on your last TM44 report. No calendar reminders, emails or certificate results are generated by this preview.
A maintenance visit, plant commissioning invoice or an EPC survey is not automatically a statutory air-conditioning inspection. Find the date printed on the complete TM44 report.
Check the correct address, equipment and relevant controller. Major alterations or a transferred system may need additional technical review; a historical date alone cannot certify today's plant.
The date below is an indicative outer planning milestone for a qualifying system in any UK nation. Set an internal booking target ahead of it, allowing for access and assessor availability.
A newly installed qualifying system has first-inspection rules connected to when it was first put into service. A change of technical control can create particular report handover duties. Scotland and Northern Ireland have their own regulations; the planner applies each nation’s five-year maximum and links to it.
If the previous report is missing, the equipment has been replaced, the relevant controller is unknown or the premises include several independently controlled installations, record the status as UNKNOWN until the appropriate evidence is checked. Do not treat the calculated date as an automatic compliance certificate.
In England and Wales, regulation 18 specifies the recurring inspection interval and the appropriate accreditation requirement. Northern Ireland sets the same five-year maximum in regulation 15, and Scotland in regulation 17 of the Building (Scotland) Regulations 2004. The government guidance explains who must arrange and retain reports and how inspection evidence should be checked.
Send the property address, previous inspection report and any known cooling-plant changes. A suitable assessor, scope, site access and reporting times must be confirmed before booking. The planner does not send an enquiry. Use the enquiry page or call the office to discuss a renewal.