Air-conditioning energy assessment / Survey process
A TM44 survey should explain your cooling system, not just produce paperwork.
A TM44 survey is the on-site air-conditioning energy-efficiency inspection undertaken by an appropriately accredited assessor where the statutory requirements apply. Its purpose is to inspect the relevant systems, evaluate efficiency and provide a documented report with appropriate recommendations.
- Quotation agreed before any visit
- Accredited energy assessors
- Report lodged where a register applies

When is the survey required?
In England and Wales, a qualifying air-conditioning system is one with an effective rated output of more than 12 kW. Where a relevant person controls the temperature of multiple units within a building, the systems may need to be assessed together. Statutory inspections are required at intervals not exceeding five years.
Do not assume an individual unit's nameplate rating establishes whether the whole building is outside the threshold. The responsible person and controls matter. Scotland and Northern Ireland must be checked against their own national guidance.
Before the assessor visits
Useful preparation includes access to internal and external cooling equipment, plant locations, operating information and available manufacturer documentation. Building-management controls, occupied areas and health-and-safety conditions should be clarified with the facilities team before booking.
- Building address, site boundaries and each system or floor in scope.
- Equipment inventory, cooling output, serial information and recent changes where available.
- Existing TM44 reports, maintenance records and details of current operating controls.
- Authorised access to rooftops, risers, plant rooms, tenant spaces and controlled areas.
- Facilities contact, induction rules, escorts and safe working arrangements.
Missing records do not automatically prevent a conversation about the survey. They may change the assessor's required preparation, quotation and final report limitations.
Request a scope-based survey quotationWhat happens during the visit?
The accredited assessor reviews the relevant cooling equipment, system condition, operation and controls to the extent required by the inspection methodology and the access available. The inspection is an energy assessment, not a comprehensive repair programme, and it cannot be treated as proof that every concealed defect has been identified.
Centralised systems such as air handling units, chilled water plant and water-loop heat pumps need a Level 4 accredited assessor, and large VRF installations need more site time. The office should validate that suitability before committing to work.
What does the TM44 report contain?
The written output should identify the site and systems assessed, the relevant inspection findings, observations on efficiency and practical recommendations. Scope restrictions and limitations should be documented. The report is not a guarantee of particular savings, plant lifespan or a successful regulatory outcome.
Agree how the complete report is delivered and, where applicable, who is responsible for official registration or lodgement. A downloadable service invoice, an F-Gas leak-check certificate and an EPC each serve different purposes.
After the survey: evidence and renewals
Store the report, inspection date, assessor details, official reference and any recommended actions alongside your air-conditioning asset register. Qualifying England and Wales systems generally need the next statutory inspection no later than five years after the previous one. Significant plant changes should also prompt a scope review rather than blind reliance on an old report.
If a postcode search finds no record, mark the evidence state UNKNOWN until the building, report reference and official record have been checked. For a multi-site estate, keep a separate record for each building/system under the relevant person's control.