Cooling systems are complex. Your service brief shouldn't be.
Inspection, ongoing maintenance and refrigerant checks often involve the same equipment, but not the same legal duty, professional qualification or report. Start by identifying exactly what your building needs.
TM44 reporting, regular HVAC service and F-Gas work should be described separately in the quote. Availability and appropriate competence are checked before any booking is confirmed.
PLANTCONTROLSEVIDENCE
01 / IDENTIFY THE DUTY02 / CONFIRM THE PROFESSIONAL03 / RECORD THE DELIVERABLE
01 · DISTINCT SCOPE
One commercial building. Three different questions.
Old online descriptions sometimes say that “TM44-accredited engineers” carry out everything from maintenance to statutory reports. That conflates different roles. The energy assessment must be carried out by a suitably accredited assessor; practical engineering and refrigerant work may require different competent personnel.
01
STATUTORY ENERGY ASSESSMENT
TM44 air-conditioning inspection
An appropriately accredited assessor inspects qualifying air-conditioning systems and supplies the applicable energy inspection report. England and Wales generally require the assessment for systems with rated output above 12 kW at intervals not exceeding five years.
Technical contractors may inspect equipment condition, filters, condensate drainage, fans, coils, controls and faults according to plant type and the agreed maintenance schedule. Routine service cannot be substituted for an accredited TM44 inspection.
Equipment that contains regulated refrigerant may have separate leak-check and recordkeeping duties, depending on gas, charge and equipment. Regulated activities need the appropriate qualifications; frequency is not set by the TM44 five-year cycle.
You can begin with the site address, what the plant serves and whether you need an inspection report, a maintenance review or another technical service. Equipment schedules can follow if you have them; unknown values must not be invented.
For a multi-building portfolio, identify the landlord or occupier controlling each cooling installation and the relevant site contacts. A prior report may help identify gaps but cannot establish current compliance on its own.
Address, commercial use, landlord or occupier controlling plant
02Plant & cooling capacity
Equipment count, manufacturer models and rated cooling kW if known
03Service history
Previous TM44 report, HVAC service history, faults and F-Gas records
04Site access
Plant room and roof access, inductions, restrictions and escorts
05Required outcome
Accredited inspection report, technical service quotation or separate leak-check scope
03 · COMPLIANCE BOUNDARIES
Maintain the system. Protect the evidence.
An annual service visit or refrigerant check does not restart a statutory TM44 inspection period. A TM44 report does not certify that all maintenance or refrigerant work has taken place. Each record needs its own assessed systems, dates, responsible party and scope.
Tell the office the property, required outcome and any known constraints. We can review a clear brief and assess appropriate accredited assessors or qualified technical contractors. No service availability, price or time is confirmed by this page.