TM44 inspections for commercial buildings020 3811 8331

Optional equipment and site information / Send it in one step

Good TM44 quotations start with accurate facts, not a perfect equipment spreadsheet.

If the office needs more information after your first enquiry, this optional checklist helps you prepare it. Unknowns are acceptable. The builder below runs in your browser. When you are ready, send the answers to our office with the enquiry form at the end; nothing is sent before then.

  • Quotation agreed before any visit
  • Accredited energy assessors
  • Report lodged where a register applies
SUPPORT TOOL / FASTER, MORE ACCURATE QUOTES

Provide what you know.
Mark what you don’t.

Start with the short enquiry first. A building address and the reason for the inspection are enough for an initial conversation. The more detailed information helps the office define what an accredited assessor needs to inspect, so your quotation is accurate first time.

01 · BEFORE YOU PREPARE THE DRAFT

Four steps to a properly scoped quotation.

A complete technical brief avoids vague pricing and repeat visits. It should separate verified equipment facts from unresolved information.

01

Start with the address and purpose

For a first enquiry, identify the exact building and why you need an inspection: expiry, missing report, newly installed cooling, landlord handover or a larger estate review.

02

Add only the cooling information you know

List system types, approximate unit counts, rated cooling capacity from genuine manufacturer records and available TM44 report references. Leave uncertain entries as 'not known'.

03

Explain the access conditions

Describe the relevant building areas, safe entry arrangements, access contact and permissible attendance windows. Do not disclose door codes, security credentials or identifiable occupants.

04

Agree the assessor's scope and written terms

The office must confirm the equipment scope, suitable accredited assessor, price and VAT, attendance arrangements, report/lodgement deliverables and expected reporting timeline before accepting a booking.

What is optional, and what should never be guessed?

Equipment make/model, number of cooling systems, effective rated cooling output and prior reports are helpful but not mandatory for an initial contact. The England and Wales statutory threshold is more than 12 kW effective rated cooling output, including relevant smaller units controlled by the same person within a building. Electrical input and heating output are not substitutes for the actual rated cooling capacity.

If you are not sure how systems are grouped or who is responsible for plant operation, record UNKNOWN. A properly accredited assessor can help establish the technical inspection scope; a browser-only checklist cannot certify statutory compliance.

02 · MATCH THE BRIEF TO THE BUILDING

Three cases that change what the assessor needs.

These are illustrative technical situations, not completed customer projects or advertised fixed-price inspection packages.

SMALL COMMERCIAL PREMISES

A few split units but no cooling schedule

Share the manufacturer models, numbers of actual systems, building address and whether the same operator controls all units. Do not guess rated output or count every multi-split indoor head as independent outdoor plant.

Build an initial equipment list
MULTI-LET BUILDING

Landlord plant and tenant-installed cooling

Identify which areas and cooling installations are landlord-operated and which are controlled by tenants. One report reference does not automatically describe every separate technical system in the property.

Understand technical control
CRITICAL OPERATING SITE

No interruption to occupied or specialist plant

Explain safe access conditions and plant restrictions without sharing confidential credentials. The assessor should scope work around authorised entry; an energy assessment is not permission to shut down critical cooling.

Plan critical-system access

Privacy and your draft

The optional builder below holds your answers in the current browser page only. Nothing reaches TM44.uk unless you submit the enquiry form beneath it. If you select Copy technical information, the prepared text is placed on your device clipboard, where other software or people using the device may be able to access it. The clipboard action is not a private encrypted submission.

Do not enter personal identifiers, building access codes, confidential security procedures, tenant details or sensitive photographs. If the office needs documents, they will tell you how to send them after your enquiry.

Stage 2 · Technical information

Provide what you know. Skip what you don't.

Your initial enquiry should be short. These details are helpful after you make contact, so our team can determine the appropriate assessor, scope and quotation. All technical fields are optional.

0 of 11 questions addressed · No pressure to complete every field
01

For a school, specify the new block or building within the estate

02

Approximate number, if available

03

Approximate number linked to the outdoor equipment

04

A photograph of a technical label may help your office later

05

List any other HVAC plant serving the assessment scope

06

Say unknown if the existing paperwork cannot be located

07

Describe what documents you have; the office will tell you how to send files

08

Optional evidence; do not supply unrelated personal data

09

New block only, or other buildings within the site?

10

Visitor registration, inductions, permitted times and rooftop access

11

A firm deadline or an approximate timeframe

What about an asset schedule or photographs?

Plant schedules, an existing report, equipment-label photos or maintenance records all help. Once you've sent your details, the office will reply with a simple way to share files. They can't be uploaded on this page.

For school premises, do not upload photographs identifying children or unnecessary personal information. We only need relevant plant and building access details.

Nothing is saved or sent until you submit the enquiry form below. You can also copy the brief and email it to office@tm44.uk.

What happens after the office receives genuine site details?

Where a live enquiry has actually been submitted, the office reviews equipment complexity, accredited-assessor suitability, access constraints and reporting needs, then asks only for the details required to produce a scope and quotation. Technical follow-up is not a booking confirmation or statutory report.

Any inspection fee, VAT, travel or out-of-hours costs and report lodgement arrangements must be agreed separately. An independent TM44 assessor must complete the qualifying energy inspection and produce the report; an equipment checklist does not issue certificates.

03 · PREFER A SHORT ENQUIRY?

A useful first enquiry can be short.

The technical information above is optional. Answer one question and the send form appears, or use the quote page with just the address, or call 020 3811 8331.

Email the TM44 office