This accessible text guide explains eight points to discuss with a qualified service engineer. It does not verify that these checks have been completed at your site.
What you need to know
- Confirm the plant and manufacturer-specific maintenance scope before attendance.
- Discuss filters, airflow, coils, controls and condition with a competent commercial engineer.
- Use certified personnel for regulated refrigerant work and keep the appropriate records.
- Treat TM44 energy assessment, EPCs and servicing as distinct obligations.
1. Review the equipment inventory
List the equipment, manufacturer models, installed location, known rated capacity and plant condition. A service proposal based solely on property size may overlook rooftop units or independently controlled tenant systems.
Check which assets are included in the contract and which are excluded; record unknown information honestly rather than inventing an equipment count.
Commercial servicing overview2. Discuss filters and airflow
Appropriately qualified engineers can review filters, accessible airflow pathways and equipment performance as relevant to manufacturer instructions and the site risk assessment.
A dirty filter can be a maintenance issue, but neither a visual observation nor a generic checklist proves that a particular system meets every ventilation or indoor-air-quality requirement.
3. Assess accessible coils and heat exchange
Discuss inspection and cleaning of heat-exchange surfaces where appropriate and safe. The work method depends on actual plant design, isolation, access and operating constraints.
Do not promise invasive cleaning, shutdown or plant access until the site's engineering and safety arrangements have been confirmed.
4. Review operating controls and schedules
Commercial buildings can have inappropriate operating hours or poorly aligned zone controls, but changes must be validated against actual occupancy, comfort and critical operating requirements.
A TM44 energy inspection may recommend efficiency improvements, while recommissioning is a separate technical workstream requiring an agreed scope.
Post-TM44 improvement review5. Consider refrigerant-related obligations
F-Gas leak checks and regulated refrigerant handling are governed by separate requirements that depend on refrigerant and system facts, including charge and applicable exemptions.
Check the specialist's required personnel qualifications and company certification before commissioning regulated work. An ordinary energy-assessor accreditation does not itself authorise refrigerant work.
Separate F-Gas compliance guide6. Review electrical and mechanical condition
Qualified engineers may identify wear, abnormal noises or control and component issues during an agreed service. Appropriate electrical testing, repairs or replacements require the right competency and authorisation.
Do not assume that an informal maintenance observation certifies the complete installation or replaces any separate statutory inspections.
7. Record findings and possible next actions
A useful service record identifies equipment checked, limitations, observations, parts or work recommended, and items requiring follow-up. Keep actual evidence separate from estimated savings or unverified claims.
Before authorising expensive repair or replacement, obtain a clear scope and consider condition, service life, downtime, design and whole-life costs.
Repair, recommission or replace?8. Check TM44 inspection evidence independently
In England and Wales, qualifying air-conditioning systems with effective rated cooling output greater than 12 kW require accredited energy inspections at intervals not exceeding five years, subject to the actual system and responsibility rules.
A maintenance receipt, F-Gas record or EPC is not a TM44 report. Check the inspected equipment, assessor, date and applicable official reference before making a compliance claim.
Request a TM44 quotationCheck the governing guidance
This article does not authenticate a government register entry or establish the status of an individual building. Confirm the applicable national framework and the actual installed equipment before relying on a compliance conclusion.
England and Wales legal points are anchored in current government publications and the regulations. Technical applicability for a specific building still requires its actual system information.