Air Conditioning Over 12 kW: TM44 Inspection Requirements

An air-conditioning system with an effective rated output of more than 12 kW may fall within the statutory inspection regime in England and Wales. An equipment count or a salesperson's estimate is not enough to decide whether that applies.

The threshold includes the way multiple systems are controlled in the same building. This guide explains what to identify before an accredited assessor examines the installation.

The essentials

What you need to know

  • More than 12 kW, not 12 kW or more, is the statutory England and Wales threshold.
  • Units controlled by the same relevant person in a building may need to be grouped.
  • Qualifying systems require inspection by an appropriately accredited assessor at intervals not exceeding five years.
  • Lack of an online record must not automatically be treated as a formal non-compliance ruling.
01 / 12

What does effective rated output mean?

The relevant figure is the manufacturer's rated cooling output of the air-conditioning system, not electricity used by the equipment. Heating-capacity figures and the rated input power may give a misleading result if substituted for cooling capacity.

Use manufacturer plates, asset schedules or an appropriately qualified assessor to establish capacities. If the exact specification is not known, state this explicitly instead of reporting an invented capacity.

Use the 12 kW screening guide
02 / 12

What if the recorded output is exactly 12 kW?

For a relevant system in England and Wales, the statutory trigger is more than 12 kW effective rated output. A verified value of exactly 12.0 kW does not exceed that threshold. An uncertain or rounded value must not be treated as confirmed exempt without checking manufacturer specifications and actual system boundaries.

For example, four correctly identified independent 3.5 kW split systems might total 14 kW where a single relevant person controls their temperature in the same building. The example is hypothetical, not a customer case study or an instruction to add all equipment at different addresses.

Always distinguish rated cooling output from electrical input and avoid using a quoted total with unknown system control to pronounce a building compliant or non-compliant.

Check the exact 12 kW threshold
03 / 12

How can VRF and multi-split capacities be counted without duplication?

A system can include several indoor units sharing outdoor refrigerant plant, branch controllers or heat-recovery equipment. Adding every indoor-unit nameplate to each associated outdoor-unit nameplate can count the same cooling capacity twice and produce a false eligibility result.

Identify the installed arrangement and obtain the manufacturer cooling output or appropriate engineering schedule for the relevant system. Do not sum heating ratings, electrical consumption, supply-air flow or every unit in an unrelated building as though they were cooling outputs under common control.

Where the plant is complex or the records conflict, mark capacity uncertain and refer it for competent technical review. A screening calculator is a preliminary guide, not a substitute for an accredited statutory assessment.

Prepare cooling plant and system details
04 / 12

What happens with several separate air-conditioning units?

Regulation 17 addresses buildings where the relevant person controls the temperature of more than one individual unit. Those individual units may be treated as components of a single air-conditioning system when applying the output threshold.

For an office with several smaller splits, first map the units and their controls. Do not automatically assess each indoor cassette as an isolated system, and do not assume all installations in a multi-let building belong to one controller.

Read legal responsibility guidance
05 / 12

Which buildings are likely to contain qualifying systems?

Offices, hotels, larger retail units, leisure sites, hospitals, schools and mixed-use premises may contain cooling systems exceeding the threshold. Building type alone does not establish whether the statutory duty applies.

An estate may include individual buildings with distinct plants and inspection schedules. Record the address, capacity, controls, plant type and current report evidence for each relevant installation.

  • Obtain equipment make/model and cooling output where possible.
  • Record outdoor/indoor unit combinations and central plant.
  • Identify the relevant person controlling temperatures.
  • Note existing report references, inspection dates and unresolved evidence.
See commercial TM44 inspection services
06 / 12

What does the accredited 12 kW inspection actually provide?

The appropriately accredited energy assessor reviews accessible relevant cooling plant, operation and controls and prepares a building-specific air-conditioning energy report. Recommendations may cover efficiency, controls and whether the system is suitably sized for the space served.

The inspection is not a refrigeration pressure test, F-Gas certificate, repairs appointment or an EPC. A sales confirmation is not proof of inspection; retain the actual report, date, identified systems and official lodged reference where applicable.

Access limitations, plant not reached and uncertainty over equipment should be reflected in the report or follow-up scope rather than silently treated as fully inspected.

Understand an official TM44 report
07 / 12

When must the system be inspected?

In England and Wales qualifying systems must be inspected at intervals not exceeding five years. Other duties may arise when responsibility changes and a required report is not passed on. Check the applicable legal framework for the specific property.

The resulting inspection report contains technical findings and recommendations. Service visits, refrigerant checks and an EPC do not replace the accredited inspection.

Read the inspection requirements
08 / 12

Do new consultations change the 12 kW threshold in 2026?

Use the current England and Wales regulations and GOV.UK guidance to establish the more-than-12 kW effective rated output test. A proposal to change inspection requirements is not evidence that a different threshold or enforcement rule has entered into force.

Read any consultation alongside enacted legislation, commencement dates and final government decisions. Confirm the rules that apply to the actual site and inspection date before changing an inspection or renewal plan.

When advising a customer, use the applicable legislation on the inspection date, identify whether the building is in England, Wales, Scotland or Northern Ireland, and avoid applying England and Wales wording automatically to every UK location.

See current regulations and national distinctions
09 / 12

Can a TM44 report guarantee lower bills or a better EPC?

TM44 findings can identify potential control, schedule and equipment-efficiency improvements. A recommendation is not a completed change or evidence of a measured reduction, and an energy inspection does not itself improve an EPC rating.

Any action arising from a report should be separately scoped, agreed and implemented by competent professionals as appropriate. Savings require actual baseline and post-change measurement, while an EPC and any MEES obligations remain separate assessments.

Confirm any proposed visit, reporting and lodgement dates with the office. Location and system complexity affect planning; a general guide cannot reserve an assessor or guarantee certificate delivery.

Learn what report recommendations mean
10 / 12

What if capacity details or the existing report are missing?

A failed postcode search and an unavailable official registry service are evidence gaps, not verified conclusions about a particular property's compliance. Request records from the occupier, owner, assessor or managing agent and review the system scope.

The online eligibility questions can help prepare the enquiry, but an accredited inspection or appropriate technical review is necessary where plant configuration is uncertain.

Check existing report evidence
11 / 12

How should a multi-site business manage the capacity test?

For a retail chain, school estate or building portfolio, create an evidence row for each physical building and the relevant cooling systems and control arrangements. An aggregated nationwide unit count cannot replace the building and responsible-person assessment required by the applicable law.

Keep the available plant schedule, last inspection date, report reference and site contact. Mark UNKNOWN where the capacity or controlling party has not been established. Plan phased visits only after appropriately accredited assessor availability and practical access are confirmed.

A portfolio price or proposed target date does not mean a system has been inspected, and a report issued for one address should not be presented as proof that other sites are covered.

Plan a multi-site TM44 programme
12 / 12

How can I request an accurate inspection quotation?

Start with the site address, contact information, approximate unit count and whether one building or an estate needs inspecting. It is acceptable not to know the exact capacities at first contact.

The office can ask for photographs of model plates, any asset schedule, access details and a previous TM44 report through a private technical follow-up. A received enquiry is not an inspection booking or fixed quotation.

Request an inspection quotation
Verification / Official sources

Check the governing guidance

This article does not authenticate a government register entry or establish the status of an individual building. Confirm the applicable national framework and the actual installed equipment before relying on a compliance conclusion.

England and Wales legal points are anchored in current government publications and the regulations. Technical applicability for a specific building still requires its actual system information.