TM44 inspections for commercial buildings020 3811 8331

Inspection process / Site preparation

What Happens During a TM44 Inspection? Step-by-Step Guide

A TM44 inspection is an energy-efficiency assessment of a qualifying air-conditioning system, not a routine service or a promise that every component will be dismantled. The assessor reviews the accessible relevant equipment, controls and supporting records before producing a report.

The exact inspection varies by building. A hotel with rooftop chillers, a small office with split units and a school with mixed-age plant need different access plans and may require different assessor accreditation levels.

The essentials

What you need to know

  • Confirm the exact buildings, controlled systems and rated cooling capacity before the visit.
  • Prepare plant access, operating information and any existing HVAC schedule or TM44 report.
  • The accredited assessor examines accessible plant, equipment and controls and prepares energy-efficiency recommendations.
  • Agree report preparation, relevant lodgement and deliverables as part of the scope before booking.
01 / 10

Step 1: scope the building and arrange access

Provide the property address, a clear description of the intended building or blocks, and the approximate number and type of cooling systems. Where possible, include the manufacturer model, cooling capacity and plant schedule.

A building manager should identify keys, escorts, roof access, plant rooms, occupied areas and relevant site inductions. For a school or healthcare site, note safeguarding and restrictions without sending personal information about pupils or patients.

  • Exact address, site contact and included buildings.
  • Indoor and outdoor unit counts, central plant and control arrangements.
  • Available O&M manuals, asset schedules and previous TM44 reports.
  • Permit, safe access, escort and site operating-hour requirements.
See the technical information checklist
02 / 10

Step 2: confirm the appropriate assessor

Only an appropriately accredited energy assessor can carry out the required statutory air-conditioning inspection. Ask the provider to match the assessor's accreditation level to the plant's complexity and the agreed geographic scope.

The assessor may request missing information before arriving. A reputable quotation should be based on the actual equipment and access requirements rather than an unverified 'certificate' price.

Understand the inspection and quotation process
03 / 10

Which records help the assessor understand the system?

Provide available commissioning information, manufacturer ratings, maintenance history and controls descriptions alongside the equipment schedule. Records help explain the installed design, operating patterns and any changes since the last assessment.

Ask the site contact or controls operator to explain actual occupancy, time schedules, set points and zoning. Missing information should be identified as a limitation or follow-up question; it does not justify inventing measured efficiency results.

Prepare the available technical records
04 / 10

Step 3: inspect accessible equipment and controls

GOV.UK describes a visual assessment of the air-conditioning system and an examination of equipment and controls. The inspection can consider how cooling is delivered, whether controls and operation suit the building, and opportunities to improve efficiency.

Accessible parts and available information determine what can be checked. An inspection is not a guarantee of equipment performance and should not be represented as a full diagnostic repair, leak test or statutory servicing visit.

Review the official inspection guide
05 / 10

Step 4: review findings and recommendations

After site work, the assessor prepares findings and recommendations intended to help the building operator understand the system's energy performance. These may concern control settings, operating schedules, maintenance information or possible improvements.

Recommendations do not guarantee any particular percentage saving. Decisions on repairs or plant replacement should be supported by a separate engineering and financial assessment.

See what an inspection report contains
06 / 10

How should recommendations become a practical action plan?

For England and Wales, the inspection recommendations are advisory: the inspection regime does not require their implementation. Other maintenance or safety obligations may apply independently. Review each suggestion against the actual building before commissioning work.

Possible topics include operating hours, conflicting control settings, airflow or maintenance concerns, sizing and replacement options. Ask a suitable contractor to investigate concerns rather than treating the inspection as a completed repair or a refrigerant diagnosis.

  • Record the recommendation, affected system and any information still needed.
  • Separate operational adjustments from work requiring technical design or a contractor.
  • Compare expected costs and benefits before approving investment.
  • If a measure is implemented, compare suitable energy data before and after, allowing for weather, occupancy and operating hours.
Understand report recommendations
07 / 10

How does TM44 relate to servicing, F-Gas, EPC and MEES?

An air-conditioning energy inspection does not replace servicing, F-Gas checks or a separate building energy assessment. A possible refrigerant or equipment concern should be referred to a suitably qualified person under the applicable regime; TM44 does not itself include a leak-test service.

An inspection recommendation does not automatically change an EPC rating, establish MEES compliance or verify carbon savings. Keep the relevant records and specialist decisions separate even when the work is coordinated for the same property.

Review the official inspection guidance
08 / 10

Step 5: complete the reporting and lodgement process

The quotation should identify the inspection report as a deliverable and confirm the appropriate registration process where required. In England and Wales, relevant reports must be lodged as prescribed; the assessor or agreed provider should communicate the report reference.

Keep the completed report, inspected system scope, inspection date and relevant register evidence. If access restrictions mean a system was not assessed, address that limitation rather than treating the entire building as automatically compliant.

Read about certificate and report lodgement
09 / 10

Keep the report useful across the property portfolio

Store the complete report with its actual inspection date, equipment scope, assessor details and relevant register reference. Record access limitations and outstanding scope questions so the next manager can understand what was assessed.

For several premises, retain a separate evidence record for each relevant building or system and an earlier scheduling milestone before the next inspection is due. A portfolio summary must not hide a missing site report or imply that recommendations have been completed.

Plan inspections across an estate
10 / 10

How long does the inspection take?

There is no dependable universal duration for every installation. System count and complexity, distributed plant, induction, travel between buildings and the quality of existing records can all affect site time.

If a hard business deadline applies, provide it before quotation. Assessor capacity and reporting/lodgement arrangements must be confirmed rather than guaranteed through a static website.

Agree access to occupied areas, escorts and any planned equipment interruption before the visit. A quiet inspection cannot be promised for every site; restricted access or incomplete records may require further arrangements. Site attendance and delivery of the lodged report are separate stages.

Request a scope-based TM44 quotation
Common customer questions / independent guidance

Frequently asked questions

General guidance only. Inspection status and the correct assessor depend on the actual building, equipment and applicable UK nation.

What happens during a TM44 inspection?

An appropriately accredited assessor examines accessible air-conditioning equipment, controls and relevant records. The inspection focuses on energy efficiency and sizing compared with building demand; it is not a routine maintenance, repair or F-Gas leak-test visit.

How long does a TM44 inspection take?

The visit depends on system counts, plant complexity, access, induction and whether suitable asset records are available. Request a site-specific inspection scope rather than relying on a universal one-hour or same-day promise.

Which documents should the site team prepare?

A plant schedule, manufacturer cooling-capacity data, previous TM44 report, available O&M manuals, controls information and any roof or plant-room access arrangements help the assessor establish a reliable scope.

Will the inspection disrupt our business?

Some occupied areas, rooftops or plant rooms may need escorted access or permits. Agree operating restrictions with the assessor in advance; whether equipment interruption is necessary depends on the technical inspection method and site.

Is TM44 just a compliance certificate?

No. The accredited assessment produces a written report describing inspected systems, energy efficiency, sizing and relevant improvement recommendations. An invoice, service sheet or provisional online status is not equivalent to this report.

What happens if a required inspection is overdue?

For England and Wales, GOV.UK currently lists a £300 penalty for failing to hold the required report. Check whether the building and equipment are in scope, retrieve any lodged report and arrange an accredited inspection if the duty is unmet. Do not confuse proposed penalties with current law.

How frequently must a qualifying system be inspected?

England and Wales require relevant air-conditioning inspection intervals not exceeding five years; the correct interval and statutory regime can differ in Scotland and Northern Ireland. Record the actual inspection date, not the date a PDF was downloaded.

Can I get the report or lodgement on an urgent deadline?

Explain your deadline and equipment schedule when requesting a quote. Engineer attendance, report preparation and applicable lodgement are separate deliverables. No fixed emergency turnaround should be promised before an accredited assessor accepts the scope.

Next step / Search intent

Preparing a building for the assessor?

Compare the inspection process with the report evidence and access information your site team can provide before the visit.

Verification / Official sources

Check the governing guidance

This article does not authenticate a government register entry or establish the status of an individual building. Confirm the applicable national framework and the actual installed equipment before relying on a compliance conclusion.

England and Wales legal points are anchored in current government publications and the regulations. Technical applicability for a specific building still requires its actual system information.