TM44 Inspections for Offices and Corporate Headquarters

Modern offices can operate central chillers, VRF systems, meeting-room units and independently installed tenant cooling. An estate team should not assume that one report, one postcode or a landlord's plant register automatically describes all the air-conditioning systems in a building.

For qualifying air-conditioning systems in England and Wales, the effective rated output threshold is more than 12 kW, with specific grouping and responsible-person considerations. A reliable inspection programme begins with the actual system and the party controlling its operation.

The essentials

What you need to know

  • Record central and tenant-controlled plant separately before defining the accredited assessor's scope.
  • A landlord's EPC, service record or refrigerant certificate is not a substitute for a statutory air-conditioning energy inspection report.
  • Coordinate safe roof, plant-room and controls access with the building manager and occupied office hours.
  • Maintain inspection dates, report references and changed-equipment questions at building level.
01 / 06

Which office systems are relevant to TM44?

A building may have rooftop packaged systems, chillers, air-handling units with mechanical cooling, or local split and VRF installations. Rated cooling capacity, controls and system groupings need technical evidence; equipment count alone cannot decide whether the statutory threshold is crossed.

An office block can include multiple occupiers and independently controlled equipment. Confirm who actually controls the system and whether existing records cover newly installed plant rather than treating the entire property as one undifferentiated system.

Check the qualifying cooling-system threshold
02 / 06

Landlord, tenant and managing-agent responsibilities

The person who controls the operation of the relevant air-conditioning system is central to identifying the responsible party. A managing agent may coordinate access and documentation, while an occupier can operate additional equipment that requires a separate scope review.

Do not automatically transfer statutory obligations to the property owner or presume that an FM contractor's maintenance agreement makes it responsible for every inspection. Record the contractual and technical facts for each installation.

Review who is legally responsible
03 / 06

Planning a practical headquarters inspection

Provide the building address, access arrangements, known plant inventory, last report and information about rooms with restricted operation. In larger headquarters, a controls engineer or site facilities contact may need to support the accredited energy assessor during attendance.

An inspection evaluates the relevant air-conditioning system's efficiency and sizing, and operational recommendations. It does not independently certify business continuity, safe operation of every plant item, or satisfactory F-Gas compliance.

Understand the actual site inspection
04 / 06

Keeping compliance evidence usable during a lease or sale

Record which building and cooling equipment a report covers, when the inspection occurred, the assessor details and any applicable official register reference. A missing online record is not, on its own, evidence that no inspection happened.

Purchasers and letting teams should verify document completeness and whether material equipment changes postdate the report. Commercial EPC and MEES obligations are separate matters and should be assessed independently.

Check a report using the official evidence path
05 / 06

Portfolio renewal planning for office estates

A multi-office estate benefits from a per-building schedule of known inspection dates, cooling equipment, responsible people and unknown records. In England and Wales, qualifying inspections follow an interval not exceeding five years; the actual dates must come from evidence, not a default spreadsheet calculation.

Group site visits only where accredited assessor availability, geography, operating requirements and scope make that practical. Do not assume a single national visit cost or guaranteed report timing.

Coordinate multiple office locations
06 / 06

Requesting a suitable commercial office quotation

A useful enquiry gives the office location, approximate floor area or number of separate plant systems, previous reports if held, access limitations and the actual desired deadline. Capacity details can follow when an asset register is incomplete.

The office should confirm assessor qualification, exact work scope, reporting and lodgement responsibilities, VAT and potential special-access charges before a booking is agreed.

Request an office TM44 quotation
Verification / Official sources

Check the governing guidance

This article does not authenticate a government register entry or establish the status of an individual building. Confirm the applicable national framework and the actual installed equipment before relying on a compliance conclusion.

England and Wales legal points are anchored in current government publications and the regulations. Technical applicability for a specific building still requires its actual system information.