TM44 inspections for commercial buildings020 3811 8331

Education / Estates teams

TM44 Inspections for Schools and Colleges

School and college cooling often sits in pockets: an ICT suite, administrative office, teaching block or server room. An estates team needs to know which equipment is connected and who controls it before relying on a campus-wide certificate assumption.

For England and Wales, this guide concerns the accredited energy inspection of qualifying air-conditioning systems. Safeguarding, safe engineering access, refrigerant work and wider building compliance require separate arrangements.

The essentials

What you need to know

  • Map equipment across teaching, administrative and technical spaces.
  • Clarify trust, local-authority, landlord and contractor responsibilities.
  • Arrange escorted access and safeguard pupil information.
  • Keep a building-specific report and a dated estates action record.
01 / 06

Check classroom, staff and server-room cooling

List cooled teaching rooms, offices and technical rooms with the systems that serve them. Include equipment added during ICT upgrades or temporary classroom projects, and flag server cooling for careful purpose and scope review.

Use asset identifiers and equipment locations rather than class lists or pupil timetables containing personal information. A previous report should be compared with the current plant register, not assumed to cover all recent additions.

Review qualifying TM44 requirements
02 / 06

Review school estate responsibility and control

Establish which body controls technical operation: the school, academy trust, local authority, landlord or another party. A facilities contract should make clear who arranges inspections and who keeps the report.

Where responsibility is shared, name the contact who can secure access and obtain plant records. Resolve gaps between a central estates team and individual premises staff before setting the assessment boundary.

03 / 06

Identify plant grouping and system capacity

Collect manufacturer cooling ratings and a simple building-by-building system diagram. Avoid adding indoor heads and their supplying outdoor unit twice or aggregating every school in a trust into one threshold calculation.

Relevant units under common control in one building may need grouping; England and Wales uses more than 12 kW effective rated output. Record unknown ratings as questions for the assessor rather than entering guessed capacities.

04 / 06

Arrange safe access during school operations

Agree visitor sign-in, escorts, safeguarding requirements and access to locked teaching rooms. Holiday periods may simplify access, but explain whether cooling and controls will be operating normally during the proposed visit.

Roof access, permits and technical isolations belong with authorised competent staff. Do not use a caretaker escort as a substitute for a safe access method or ask school staff to expose live equipment.

05 / 06

Separate statutory assessment from maintenance programmes

Retain maintenance visits, refrigerant work and the accredited TM44 report as distinct records. A contractor service sticker does not establish that an energy inspection has been carried out.

The report can help identify improvement opportunities, but proposed work should be assessed for safety, teaching needs and budget before implementation. Avoid treating recommendations as automatic instructions to alter classroom operating conditions.

06 / 06

Keep inspection dates and reports available for estates audits

Keep the full report, inspection date, assessor details, reference and scope against the relevant building record. Track access limitations and outstanding clarifications alongside the next inspection planning date.

When a school joins a trust or site management changes, request the existing evidence during handover. The incoming team should know which documents were actually received and which systems still need review.

Request an accurately scoped TM44 quote
Verification / Official sources

Check the governing guidance

This article does not authenticate a government register entry or establish the status of an individual building. Confirm the applicable national framework and the actual installed equipment before relying on a compliance conclusion.

England and Wales legal points are anchored in current government publications and the regulations. Technical applicability for a specific building still requires its actual system information.